Management of Change and
Pre-startup Safety Review (PSSR) Management of Change is the element for which
all other foundation elements of Process Safety
Management (PSM) are implemented. It is the PSM
element that controls the introduction of new risk. Recognizing change,
analyzing the danger of every change, and doing small changes efficiently are
just a few of the hurdles that managers face with MOC implementation.
The aim of a pre-startup safety
review is to assist make sure that proper safety measures are taken and are
operational before a new chemical is placed or the current chemical plant is
modified. The pre-startup review confirms that before the introduction of a
modified chemical or a modification to the current hazardous chemical
inventory:
·
Construction of equipment is in
conformity with design specifications;
·
Safety, maintenance, operating,
and emergency procedures are in their proper place and correct;
·
For new chemicals, a PHA has been
performed and recommendations have been resolved or implemented before the
chemical arrives on the site;
·
For changed processes, the
Management of Change requirements have been met; and
·
Training of each employee involved
in handling the dangerous chemical has been completed.
The Pre- Startup Safety Review is
a safety review conducted before the startup of a modified or new manufacturing
factory or facility to make sure that installations meet the first design, to
catch and re-assess any potential hazard from the changes during the detailed
construction and engineering phase of the project. In other words, it makes
sure the status of the processing facility.
The Main Activities in the PSSR
of a Project
Following activities are
administered during a PSSR with coordination between Contractor and Owner of
the plant/facilities:
·
Do PSSR participation from the
authorized Contractor and Owner personnel
·
Do Technical and HSE reviews of
documentation
·
Verify all construction and
equipment is in conformity with safety, environmental and health regulation,
and standards.
·
Complete all corrective action
items raised within the PSSR.
·
Complete Post- Start-up corrective
action items.
·
The representative of the Project
Owner signs the PSSR checklists for approval of the commissioning/start-up of
the plant.
·
Documentation of PSSR.
How TheSafetyMaster can Help:
·
TheSafetyMaster provides training
and certifications for Pre-startup Safety Review.
·
TheSafetyMaster has a team of
experts who are specialized in Pre- Startup Safety Review and they help your
organization to conduct PPSR and train your employees to conduct the same after
then.
·
We are a renowned company for
conducting a HAZOP Study for
the organization if required. We also give Behavior-Based Safety
Training and many more.
·
We also provide standard document
development for the Pre-startup safety review.
Please
contact us at info@thesafetymaster.com or 7665231743 with your inquiry.